Travel · Rail, Channel & ferries · 28 November 2026

A4010 Bradenham Road closes for bridge repairs

The A4010 Bradenham Road near High Wycombe will close fully for urgent bridge repairs, Network Rail has announced. The closure runs from Monday 23 November to Friday 11 December. Engineers will repair damage caused by vehicle strikes.

Network Rail has announced that the A4010 Bradenham Road near High Wycombe will undergo a full closure for urgent repairs to a railway bridge. The bridge, which carries the Chiltern main line, has sustained damage from vehicle strikes. The works are required to repair damaged brickwork and ensure the structure's integrity.

Adam Checkley, engineering director at Network Rail, said: "These repairs are critical." Figures published with the announcement show that 1,706 bridge strikes were recorded in 2025/26, resulting in 185,319 minutes of delays to rail passengers. The total cost of delays, cancellations and repairs is £13.25 million. Train services will not be disrupted during the road repair work.

The closure begins on Monday 23 November and ends on Friday 11 December, with reopening expected on Saturday 12 December. A full closure is necessary to position scaffolding and specialist equipment within the carriageway. Drivers are advised to follow signed diversion routes and allow extra time. Network Rail is working with Buckinghamshire Council, a nearby school, and residents to reduce the impact on the local community.

The original: Bridge strike damage prompts urgent closure of A4010 near High Wycombe (Network Rail, 20 November 2026)

Written by StreetOwl from Network Rail’s own announcement. It was drafted by StreetOwl’s own model, every figure and quotation was checked by code against the announcement, and it was read and approved by Michael Rossi before it went up. It says what was announced, not what anyone should do about it.

More StreetOwl news →

← Back to StreetOwl